SOP to Training Video Checklist
Published Aug 1, 2026

Use this before turning an SOP into training
Copy this checklist into the team workspace before you create a walkthrough. It is deliberately focused on one repeatable job: a clear trigger, an intended result, and the moments where the normal route must stop or hand off.
1. Define the learning job
- Viewer role: ______________________________
- After viewing, they should be able to: ______________________________
- When they should use this walkthrough: ______________________________
- Prerequisite knowledge, equipment, or permission: ______________________________
- What this walkthrough must not be used to decide: ______________________________
2. Identify the current source
| Check | Write it down |
|---|---|
| SOP, checklist, or work-instruction title | |
| Current version or date | |
| Source owner | |
| Related job aid or controlled document | |
| Location of access-controlled or versioned details |
3. Preserve the non-negotiable information
- [ ] Required order of actions
- [ ] Visible preconditions, warnings, or quality checks
- [ ] Numbers, thresholds, units, dates, and terms the viewer must recognize
- [ ] A stop condition before an irreversible action
- [ ] An exception or escalation route
- [ ] Required evidence, record, or handoff
- [ ] A link or reference back to the current source
4. Storyboard the decision path
| Beat | What the viewer sees | Decision or action | Evidence to preserve | Next owner |
|---|---|---|---|---|
| Trigger | The cue, role, and scope | When does this task start? | ||
| First check | The condition that makes it safe to proceed | Can work continue? | ||
| Normal path | The expected sequence | What changes next? | ||
| Stop or exception | The condition that changes the route | Pause, correct, or escalate? | ||
| Handoff | The evidence and responsible role | Who owns the next decision? | ||
| Confirmation | The expected result and source reference | How is completion confirmed? |
5. Review before sharing
The team should compare the explanation with the current source. Check that the sequence is readable, exceptions are not hidden, labels and charts are legible, and the viewer can find the source for detailed or controlled information.
See the Packaging Line Changeover Checklist for a source-led operational example. Use the completed checklist as a starting point for an SOP training video.
FAQ
